Step 1. Close wash for planned downtime, typically 1-2 weeks. Step 2. Remove floor and excavate according to Belt Pit Plan, leaving wash equipment in place. Step 3. Pour concrete on new Pit floor Step 4. Allow concrete time to cure. Step 5. Pour side wall Step 6. Install new Tommy Transporter Belt Conveyor and ..

Read more

1 Power on iPad. Default password is 000000. 2 Open the main ‘Settings’ menu from the home screen. 3 In the Settings Menu select ‘Wi-Fi’. 4 Select your wash’s Wi-Fi network (this network should not be available to customers) and enter your network’s password. 5 Once you connect to the network select “iCloud” from main ..